Fast delivery all over india

EVM Type-C Wired Headphones with Mic White – EVM-HF-06

Original price was: ₹1,299.00.Current price is: ₹309.00. (Inclusive of GST)

7 People watching this product now!

Out of stock

SKU: EVM-HF06-W
  • USB Type-C connector for compatible devices
  • High-quality stereo sound with balanced audio output
  • Built-in microphone for clear hands-free calling
  • In-line controls for music and call management
  • Comfortable ergonomic in-ear design
  • Secure fit for extended listening sessions
  • Lightweight and durable construction
  • Clear vocals with enhanced bass performance
  • Ideal for music, calls, gaming, online classes, and video conferencing
  • Stylish white finish for a modern look

EVM Type-C Wired Headphones with Mic White – EVM-HF-06

EVM Type-C Wired Headphones with Mic (EVM-HF-06). Designed for smartphones, tablets, and other USB Type-C compatible devices, these earphones deliver high-quality audio for music, calls, online meetings, gaming, and entertainment. Their comfortable in-ear design and built-in microphone make them an ideal companion for everyday use.

Equipped with a USB Type-C connector, the EVM-HF-06 provides a stable digital audio connection for compatible devices without the need for additional adapters. Simply plug in the earphones and enjoy rich, balanced sound with clear vocals and enhanced bass, whether you’re listening to your favorite playlist, watching movies, or attending virtual meetings.

The built-in high-quality microphone ensures clear voice transmission during hands-free calls and online communication. An integrated in-line control lets you conveniently manage music playback and answer or end calls without reaching for your device, making it perfect for users on the go.

Designed for long-lasting comfort, the lightweight ergonomic earbuds fit securely in your ears, helping reduce fatigue during extended listening sessions. The snug in-ear fit also helps minimize ambient noise, allowing you to focus on your music or conversations.

The durable cable is built to withstand everyday use, while the sleek white finish adds a clean and modern look that complements your devices. Whether you’re commuting, working, studying, exercising, or relaxing at home, these earphones provide dependable performance and comfort throughout the day.

Type-C Earphone EVM-HF-06

Type-C Earphone EVM-HF-06

 

 

SpecificationDetails
BrandEVM
ModelEVM-HF-06
Product TypeType-C Wired Earphones
Connector TypeUSB Type-C
Audio OutputStereo Sound
MicrophoneBuilt-in Microphone
ControlsIn-line Music & Call Controls
Fit TypeIn-Ear
ColorWhite
Cable TypeWired
CompatibilitySmartphones, Tablets, Laptops, and other USB Type-C devices with digital audio support
UsageMusic, Voice Calls, Gaming, Online Meetings, Video Streaming
DesignLightweight & Ergonomic
Noise IsolationPassive Noise Isolation
Package Contents1 × EVM Type-C Wired Earphones
WarrantyAs per EVM Manufacturer Warranty Policy
Weight1 kg
BrandEVM
colorWhite
Warranty1 Year
ConnectorUSB Type-C
Cable TypeFixed Wired Connection
UsageMusic, Voice Calls, Gaming, Online Meetings, Video Streaming

Q & A

Ask a question
You must be logged in to ask a question Log In
There are no questions yet

Customer Reviews

Reviews

There are no reviews yet

Add a review
Currently, we are not accepting new reviews