Fast delivery all over india

EVM Type-C to Type-C 60W PD Fast Charging Cable Nylon Braided 1 Meter White

Original price was: ₹999.00.Current price is: ₹189.00. (Inclusive of GST)

110 People watching this product now!

Out of stock

SKU: EVM-CC05-W
  • EVM Type-C to Type-C 60W PD Fast Charging Cable
  • Supports up to 60W Power Delivery (PD) fast charging
  • High-speed data transfer and sync support
  • Durable nylon braided design for extra strength
  • Tangle-free and flexible cable construction
  • Reinforced connectors for long-lasting durability
  • Safe charging with protection against overheating and over-current
  • 1 Meter ideal length for daily use at home, office, or travel
  • Compatible with smartphones, tablets, laptops, and all Type-C devices
  • Premium white finish for a clean and stylish look

EVM Type-C to Type-C 60W PD Fast Charging Cable Nylon Braided 1 Meter White

The EVM Type-C to Type-C 60W PD Fast Charging Cable (EVM-CC-05) is a premium-quality cable designed to deliver ultra-fast charging and reliable data transfer for all modern USB Type-C devices. Built with a strong nylon braided exterior, this cable offers enhanced durability, flexibility, and long-lasting performance, making it ideal for daily use at home, office, or while traveling.

Supporting up to 60W Power Delivery (PD) fast charging, this cable ensures efficient and stable power output for smartphones, tablets, laptops, power banks, and other USB Type-C enabled devices. It significantly reduces charging time while maintaining device safety and battery health. Along with fast charging, it also supports high-speed data synchronization, allowing quick and seamless transfer of files, photos, videos, and documents between devices.

The premium nylon braided design prevents tangling and protects the cable from wear and tear, bending, and stretching. Reinforced connectors provide a secure and stable connection, ensuring long-term reliability even with frequent plugging and unplugging. Its sleek white finish adds a clean and modern look, making it a stylish yet practical accessory for everyday use.

With a convenient 1-meter length, this cable offers the perfect balance between flexibility and portability. Whether you’re charging at your desk, bedside, in the car, or on the go, it provides comfortable usage without unnecessary clutter.

 

SpecificationDetails
BrandEVM
ModelEVM-CC-05
Product NameType-C to Type-C Charge & Sync Cable
Cable TypeUSB Type-C to USB Type-C
Cable Length1 Meter
Power OutputUp to 60W Power Delivery (PD)
ColorWhite
MaterialNylon Braided
FunctionsFast Charging & High-Speed Data Sync
Data TransferSupported
Charging TypeFast Charging (PD Supported)
CompatibilitySmartphones, Tablets, Laptops, Power Banks, and all USB Type-C devices
Build QualityDurable, Flexible, Tangle-Free
Connector TypeType-C to Type-C
Safety FeaturesOverheat Protection, Over-current Protection, Short-Circuit Protection
Warranty1 Year Manufacturer Warranty
Weight1 kg
BrandEVM
EAN Code2660588972760
colorWhite
Warranty1 Year
Cable Length1 Meter
Cable TypeUSB Type-C

Q & A

Ask a question
You must be logged in to ask a question Log In
There are no questions yet

Customer Reviews

Reviews

There are no reviews yet

Add a review
Currently, we are not accepting new reviews