Fast delivery all over india

EVM Premium Type-C Nylon Braided Cable 25W White

Original price was: ₹499.00.Current price is: ₹119.00. (Inclusive of GST)

102 People watching this product now!

In stock

SKU: EVM-CM012-W
  • Supports up to 25W fast charging for compatible devices.
  • High-speed charging and data synchronization.
  • Premium nylon braided exterior for enhanced durability.
  • Strong metal connector housings for a secure connection.
  • Tangle-resistant and flexible cable design.
  • Durable construction for long-lasting everyday use.
  • 1-meter length for convenient charging and portability.
  • Reliable power delivery and stable data transfer.
  • Compatible with a wide range of USB Type-C devices.
  • Ideal for home, office, travel, and daily use.

EVM Premium Type-C Nylon Braided Cable 25W White

EVM Premium Type-C Nylon Braided Cable, 25W, Black, designed to deliver reliable fast charging and efficient data transfer for your USB Type-C devices. Built with premium materials and engineered for everyday durability, this cable is the ideal companion for smartphones, tablets, power banks, wireless accessories, and other USB-C compatible devices.

Supporting up to 25W fast charging, the cable provides a stable and efficient power supply for compatible devices, helping you recharge quickly and safely. It also enables high-speed data synchronization, allowing you to transfer photos, videos, music, documents, and other files between your device and a computer with ease.

The cable features a high-strength nylon braided exterior that offers superior resistance to wear, fraying, and tangling compared to standard PVC cables. Its reinforced braided construction is designed to withstand daily bending and frequent use, making it an excellent choice for home, office, travel, and on-the-go charging.

Premium metal connector housings enhance durability while ensuring a secure and stable connection every time you plug in your device. The robust connectors are engineered to resist corrosion and everyday wear, providing dependable performance over extended use.

With a convenient 1-meter length, the cable offers the perfect balance of flexibility and portability. It provides enough reach for comfortable charging from wall adapters, laptops, desktop computers, or power banks while remaining compact enough to fit easily into your backpack, laptop bag, or travel pouch.

EVM Type-C Charge & Sync Cable EVM-C-012-W (image 6 of 6)

EVM Type-C Charge & Sync Cable EVM-C-012-W (image 5 of 6)

EVM Type-C Charge & Sync Cable EVM-C-012-W (image 3 of 6)

SpecificationDetails
BrandEVM
ModelCM-012
Product TypeUSB-A to USB Type-C Charging & Data Cable
Charging SupportUp to 25W Fast Charging
Data TransferYes, High-Speed Sync
Connector TypeUSB-A to USB Type-C
Cable Length1 Meter
Cable MaterialPremium Nylon Braided
Connector MaterialMetal Head
ColorWhite
DurabilityHigh Strength, Tangle Resistant
CompatibilityUSB-C Smartphones, Tablets, Power Banks, Earbuds, Speakers, and other Type-C devices
UsageCharging & Data Transfer
DesignPremium Braided, Flexible & Long Lasting
Package Contents1 × EVM Type-C Nylon Braided Cable
WarrantyAs per EVM Manufacturer Policy
Weight1 kg
BrandEVM
colorWhite
Warranty1 Year
Cable Length1 Meter
ConnectorUSB-A Male to USB Type-C Male
UsageCharging & Data Transfer

Q & A

Ask a question
You must be logged in to ask a question Log In
There are no questions yet

Customer Reviews

Reviews

There are no reviews yet

Add a review
Currently, we are not accepting new reviews